Item Coversheet

Item: Water System Improvements 2017
Department: Public Works
 

The approved FY17- FY21 Capital Improvement Program includes $1,500,000 for the funding of Water System Improvements. This project is part of the Village's ongoing program to replace aging watermains throughout the Village. The Public Works Department evaluates and prioritizes watermain replacement based on defect severity, occurrence interval of failures, service reliability and other related parameters.  This year's project includes the replacement of all the watermain within the Regency Park subdivision, a storm water repair on University Drive, and grading site work to relieve storm water accumulating on East Regency Drive.  The Village often creates bidding documents with base and alternate options to leverage all possible funds for watermain replacement. 

 

Bids were duly advertised and publicly read aloud on March 27, 2017.  The bid tabulations are below:

 

BIDDER                                                GRAND TOTAL (all Alternates)

Performance Construction                                      $1,459,415.00

Fox Excavating                                                     $1,574,705.00

Elanar Construction                                               $1,582,772.00

City Construction                                                   $1,623,175.44

Patnik Construction                                                $1,651,854.00

Congdon Sewer                                                     $1,691,675.00

Alamp Concrete                                                     $1,715,022.50

RA Mancinni                                                          $1,804,086.25

Vian Construction                                                    $1,814,274.00

John Neri Construction                                            $1,844,997.00

Trine Construction                                                   $1,883,695.20

Campanella Construction                                        $1,913,115.89

Concept Plumbing                                                   $2,009,482.00

 

Performance Construction of Plano, IL submitted the lowest bid. The Village's design engineer, McClure Engineering recommends that Performance Construction be awarded the contract for the 2017 Water System Improvements. Performance Construction has performed similar work for the Village of Arlington Heights Public Works Department in the past, and their project was concluded favorably. Therefore, Staff concurs with McClure's recommendation and recommends the bid be awarded to Performance Construction. The bidder has been determined to be responsible and the bid meets specifications.

 

RECOMMENDATION

 

It is recommended that the Village Board award a contract for the 2017 Water System Improvements to the low responsible bidder Performance Construction of Plano, Illinois in the amount of $1,459,415 and authorize the execution of the necessary documents. 


Bid Section

Item:Water System Improvements 2017
Bid Opening Date:March 27, 2017
Account Numbers:$1,500,000 (Acct. 505-9001-571.50-25 WA 9001) and $59,415 (Acct. 426-7101-511.50-25 SW1520)
Total Budget for Specific Item:$1,500,000
Bid Amount:$1,459,415