Item: Para Residence - 132 W. Northwest Highway - PC#17-015
Department: Planning & Community Development
 

Requested Action

 

Planned Unit Development (PUD) to allow a building addition to the subject property. 

 

Variations Required

 

Variation to Chapter 28, Section 5.1-14.6, Required Minimum Yard, to allow a rear yard setback of 1.7’ for a dwelling unit where code requires a 30’ rear yard setback for residential units above the first floor.

 

Recommendation

 

A public hearing was held by the Plan Commission on February 14, 2018 where Commissioner Dawson moved and Commissioner Green seconded:

 

A motion to recommend to the Village Board of Trustees, approval of PC#17-015, a Planned Unit Development to allow a building addition to the subject property, and the following variation:

 

1.  Variation to Chapter 28, Section 5.1-14.6, Required Minimum Yard, to allow a rear yard setback of 1.7’ for a dwelling unit where code requires a 30’ rear yard setback for residential units above the first floor.

 

This approval shall be subject to the following conditions:

 

1.  Compliance with January 9, 2018, Design Commission motion.

 

2. A fee-in-lieu of onsite detention shall be required at the time of building permit issuance.

 

3. The petitioner shall obtain an easement from IDOT to allow for the proposed plantings within the Northwest Highway Right-of-Way and approval from IDOT for the sidewalk connection from the building to the sidewalk along Northwest Highway.

 

4. The Petitioner shall comply with all applicable Federal, State, and Village codes, regulations, and policies.

 

Roll Call Vote:  Commissioners Cherwin, Drost, Jensen, Lorenzini, Sigalos, Dawson, Green, and Chair Ennes voted in favor.  Motion carried.


Bid Section

Item:
Bid Opening Date:
Account Numbers:
Total Budget for Specific Item:
Bid Amount:
ATTACHMENTS:
DescriptionType
PC Staff ReportBoard or Commission Report
PC Minutes 2-14-18Minutes
AerialExhibits
Conceptual Plan Review Minutes 11-29-17Minutes
DC Staff ReportBoard or Commission Report
DC Minutes 1-9-18Minutes
Justification for VariationCorrespondence
Preliminary Construction & Phasing NarrativeCorrespondence
Project NarrativeCorrespondence
PlansExhibits
First Round CommentsCorrespondence
Petitioner Response to Round One CommentsCorrespondence
Second Round CommentsCorrespondence
PC Timeline TrackerExhibits